Our office is on Newport Boulevard in Costa Mesa, and the road to Laguna Beach is Coast Highway through Newport Beach and Corona del Mar and past Crystal Cove, about 14 miles to Main Beach and a little further to South Laguna. The crew comes that way, and the mixer comes down Laguna Canyon Road from the 405, because a loaded truck holds up the highway for miles. Permits go to the Community Development Department at Laguna Beach City Hall on Forest Avenue, and we file them.
The streets change the method more than the ground does. In North Laguna and downtown the lots are small and the cottages are from the 1920s and 1930s, so a job is a walk, a step and a short drive poured from a truck parked at the curb. Up Bluebird Canyon, in Arch Beach Heights and at Top of the World the streets are narrow and steep, the house is above or below the road, and the concrete goes up by pump or by barrow, which makes it a crew day more than a pour day.
The hillside is the other thing to know. Laguna Beach has moved in living memory, at Bluebird Canyon in 1978 and again in 2005, and both were slopes carrying more water than they could shed. So a slab or a wall here is built to keep water off the slope. A drive is pitched to a gutter and not over the bank, a wall is drained behind the stem to a pipe that daylights, and no yard drain is pointed at the lot below. Sea air does nothing to concrete that a hose does not wash off.