A pool deck is a wet floor before it is anything else, and in Costa Mesa it is wet on more mornings than it is dry. The marine layer sits on the mesa most days from May into August and leaves a film on every slab it covers, so a deck that is smooth, or that holds a puddle at the coping, is the one surface in the yard a bare foot slides on. So the deck is broomed across the walk, pitched a quarter inch in every foot away from the water, and jointed so it moves without the shell.
Harbor Costa Mesa Concrete was founded in 2019 by Julian Mercado, and after 15 years on flatwork crews across coastal Orange County he is beside the pool for every pour. The pools here were dug behind ranch houses in Mesa Verde, College Park and the Eastside in the 1960s and 1970s, into yards drawn for a lawn, and the deck poured with them is now 50 years old. Troweled smooth and poured hard against the coping, it has settled into the backfill until it falls toward the water.
The deck is built to the California Residential Code under a CSLB C-8 concrete license, with liability insurance on every job. Any change to the fence, the gate or the deck's height against the barrier is checked against the California Swimming Pool Safety Act, and a deck poured as part of a pool remodel is inspected by the City of Costa Mesa under that permit. Every deck carries a written workmanship guarantee against defects in how it was built.